Bid work débit

Reference data et engineering information about bid work débit pour economics applications.

bidworkflow

Overview

Engineering reference data for Bid Work Flow in economics.

Key Formulas

Present Value

PV=FV(1+r)nPV = \frac{FV}{(1+r)^n}

Discount a future value to present.

Net Present Value

NPV=t=0nCt(1+r)tNPV = \sum_{t=0}^{n} \frac{C_t}{(1+r)^t}

Sum of discounted cash flows.

Compound Interest

FV=PV(1+r)nFV = PV(1+r)^n

Future value with compound interest.

Variables

SymbolDescriptionUnit
PVPVPresent value$
FVFVFuture value$
rrInterest/discount rate
nnNumber of periodsyears

References